Fleetwood Town FC Grandstand
Fleetwood Town FC Grandstand
|
![]() |
![]() |
Client: Fleetwood Town FC Main Contractor: F Parkinsons Engineer: Partingtons & Associates Weight: 300 tonnes Duration: 18 weeks |
B&B Steelworks carried out the design, supply & installation of over 300 tonnes of steelwork along with metal decking and precast concrete staircase and terrace units. | ![]() |
![]() |